A JIT cache keyed on more than the kernel shape recompiles inside a single process: FlashInfer's micro-kernel cache key includes batch size AND workspace size, so cache growth invalidates entries it already paid for

[major] config

Fields

id
gotchas/ev-jit-cache-key-invalidation
Class
config
Severity
major
Concepts
jitmoecache-keybatch-sizekv-cacheaot
Symptom
Within one running server process, a kernel that compiled successfully at startup recompiles later, several times, as real traffic arrives. FlashInfer issue #4317 documents the mechanism in a single sentence: the micro-kernel 'cache_key includes both m and workspace.max_rows (0.6.15.post1 moe_dispatch.py:770-791, fields at :774/:778), so workspace growth invalidates already-compiled small-batch entries even within a process lifetime. With no disk layer underneath, each invalidation is a full 15 s+ recompile, not a reload.' Separately, issue #4110 generalises the shape of the problem across kernels: 'For some kernels, B/tile_v/T/cache flags/pool-strides each key a new compile', with ~800 test cases collapsing to ~200 cute.compile calls on a B200 under the current keying logic.
Root cause
The cache key is not 'which kernel' but 'every parameter that changes the generated code', and the set of keyed parameters is larger than the set a reader would guess. In this case the keyed set includes the batch dimension m, the tile_v tuning parameter, the dtype/T parameter, cache flags, pool strides, and - separately - the workspace row capacity. Workspace capacity is the nasty one because it grows WITH LOAD rather than being fixed at launch: a server that is quiet at startup and busy after is a server that generates new cache keys after startup. Note the two failure modes compound: issue #4317's process-only dicts mean there is no disk layer to fall back on, so every invalidation is a compile rather than a reload.
Workaround
Treat the cache key as part of your capacity planning rather than as an implementation detail: a workload whose batch size, dtype or workspace footprint VARIES will generate new specialisations continuously, so a fixed-shape workload is materially cheaper to start than a mixed-shape one on the same engine. Pin the parameters that you can - if you control the batch size and dtype mix, hold them fixed. Where the engine offers an ahead-of-time path, use it: FlashInfer ships flashinfer-jit-cache (prebuilt JIT shared libraries for covered specializations) and flashinfer-cubin (pre-downloaded cubin/header artifacts) precisely so that the specialisations a workload needs are compiled before it runs, and its RFC #4035 sets the goal as a representative workload suite running 'with zero runtime JIT and zero runtime artifact downloads' when both are installed, verified by FLASHINFER_DISABLE_JIT=1 and FLASHINFER_NO_DOWNLOAD=1. Note that RFC also documents the cost of that path - GitHub Releases caps each release asset at 2 GiB and FlashInfer wheels ship as release assets - so AOT coverage is a packaging tradeoff, not free.
notes
This is the mechanism record that explains WHY the stalls in [[ev-jit-compile-freezes-the-engine-mid-request]] recur mid-session rather than only at startup; a reader who only has the first gotcha will think warming up the server fixes it, and for a mixed-shape workload it does not. Confidence is held at 0.85 because #4110 is a short issue with no measurement table - the 30-50 min figure there is for a TEST RUN (tests/gdn/test_decode_delta_rule.py, 'runs very long (30-50 mins on every arch)'), not for serving, so it bounds compile cost in CI rather than in production and is not recorded here as a production figure. NOT VERIFIED: I did not measure any of these compile costs myself, and I did not confirm whether the #3836 workspace-key interaction has been changed on any release after 0.6.15.post1.

Notes

This is the mechanism record that explains WHY the stalls in [[ev-jit-compile-freezes-the-engine-mid-request]] recur mid-session rather than only at startup; a reader who only has the first gotcha will think warming up the server fixes it, and for a mixed-shape workload it does not. Confidence is held at 0.85 because #4110 is a short issue with no measurement table - the 30-50 min figure there is for a TEST RUN (tests/gdn/test_decode_delta_rule.py, 'runs very long (30-50 mins on every arch)'), not for serving, so it bounds compile cost in CI rather than in production and is not recorded here as a production figure. NOT VERIFIED: I did not measure any of these compile costs myself, and I did not confirm whether the #3836 workspace-key interaction has been changed on any release after 0.6.15.post1.

Cross-references