Used / secondary market: NVIDIA A100 80GB (bare card, ASKING band)
Fields
supply/used-a100-80gb-pcie-marketNotes
FORM-FACTOR WARNING (added 2026-10-04): this record's accelerator_ids names nvidia-a100-80gb-pcie, but the price_basis explicitly covers 'SXM4-module and SXM4-to-PCIe-converted' cards as well. The secondary market does not cleanly separate form factors, so this band is a MIXED population and must NOT be read as a PCIe-only price. An SXM4 module is useless off its carrier and is not interchangeable with a PCIe card. Treat this as 'A100 80GB, any form factor, secondary market' until a source that separates them exists. OBSERVATION DATE 2026-10-03. Source sup-price-picclick-ebay-asking. BAND: n=17, quartiles $19,995 (p25) / $21,995 (median) / $29,000 (p75), full range $16,798-$34,999. n=17 gives a usable band. This is the one datacenter line where the ASKING market and the institutional index agree in order of magnitude: Stoa's public A100 80GB index level is $9,490 (sup-price-stoa-index, condition unstated), which sits BELOW the bottom of this asking band. Two readings, both kept: either the institutional mark reflects used/refurb units and this band reflects new-in-box units relisted as used, or one of the two sources is marking something other than a bare card. Unresolved - see status. A100 SXM4 modules specifically cluster tighter and lower ($13,177-$20,290, median ~$13,378) than PCIe parts, the same form-factor artifact as the H100. Excluded from the band: 8-GPU HGX baseboards ($5,999-$54,990), A100X, H800, A800, FOR-PARTS, ECC-error and bulk-lot units.
EXPORT CONTROL (2026-10-04, mechanism-level; sources spl-eccn-3a090-ccl, spl-bis-2026-01-advanced-computing-case-by-case, spl-bis-2026-05-d5-guidance): these parts classify under ECCN 3A090.a/.b, whose thresholds are 'total processing performance' (TPP) >= 4800, or TPP >= 1600 with performance density >= 5.92 (the .b band is TPP 2400-4800 with performance density 1.6-5.92, or TPP >= 1600 with performance density 3.2-5.92). The mechanism has THREE layers and all three must be cleared, not just one: (a) LICENSE FOR EXPORT FROM THE US - controlled by the January 2026 rule (91 FR 1684, effective 2026-01-15), which moved TPP < 21,000 AND total DRAM bandwidth < 6,500 GB/s parts from presumption of denial to CASE-BY-CASE REVIEW, but only for exports from the US to end users in China/Macau, and only against six exporter certifications - US supply sufficiency judged 'taking into account normal lead times', no diversion of foundry capacity away from US end users, aggregate China+Macau shipments capped at 50% of US end-use shipments, no end-user prohibition, consignee KYC procedures, and prior verification by a qualified third-party US testing lab of TPP, total DRAM bandwidth, interconnect bandwidth and copackaged DRAM capacity; (b) END-USER AND PARENT-COMPANY SCREENING under 742.6(a)(6)(iii)(A) - per BIS guidance of 2026-05-31 a licence is required where the consignee is HEADQUARTERED in Country Group D:5 or Macau OR ITS ULTIMATE PARENT is so headquartered, EVEN IF the consignee itself is outside D:5/Macau, which means the destination country alone never answers the question; (c) THE LIMITS THAT REMAIN - reexports and in-country transfers of the same chips to China/Macau remain PRESUMPTION OF DENIAL, and exports to D:5/Macau-headquartered or -parented entities remain presumption of denial wherever the buyer sits. The Jan-2025 AI Diffusion Rule was rescinded and not enforced from 2025-05-13, but that rescission did not remove (a) or (b).
LEAD TIME: null, and deliberately so. A secondary-market LISTING has no lead time - the part either exists on the marketplace on the observation date or it does not, and the seller's dispatch time is not published and not a commitment. This is the opposite failure mode from a distributor: a backordered new part at least carries a distribution window (CDW prints '4-6+ Weeks' on some SKUs, source spl-cdw-published-lead-times-gpu-2026-10), whereas a used listing with no buyer carries nothing at all. The correct consequence for a reader is that used and auction supply cannot be scheduled around and therefore cannot carry a build plan - they are opportunistic capacity, which is the strongest argument in this slice for the renting-over-buying decision. Probe log in source spl-negative-no-oem-publishes-lead-time.