HPE ProLiant Compute XD series GPU servers (XD685 and siblings)
Fields
supply/hpe-proliant-compute-xdNotes
QUOTE-ONLY, and notably HPE is the one vendor here that routes AI-accelerator buyers to an actual STOREFRONT: Intel's Gaudi page links 'Shop HPE' straight to buy.hpe.com ProLiant compute, so a Gaudi-capable box can be configured and quoted through HPE's own e-commerce rather than a phone call. HPE is also a named partner on AMD's Instinct where-to-buy page. Verified from the XD685 product page: 'The HPE ProLiant Compute XD685 is powered by a choice of NVIDIA or AMD Instinct GPUs, and AMD EPYC 9005 Series CPUs', marketed for large-scale AI model training, NLP and multimodal training; AMD's page describes it as a 6U system with 5th Gen EPYC designed to accelerate large AI model training. The dual-NVIDIA/AMD option is the notable supply fact: it makes HPE a route to a second-source AMD capacity when NVIDIA allocation is the binding constraint. HPE also claims 18 number-one rankings in MLPerf Inference v6.0, which is a performance claim, not a supply datum. No price seen on the page, so null. BASIS as elsewhere: accelerators are configured into the node, not sold as modules. EXPORT CONTROLLED (true). Regime: US BIS advanced-computing export controls (the Oct 2023 interim final rule, 88 FR 73458 - source sup-buy-bis-2023-advanced-computing-controls), which put datacenter accelerators under ECCN 3A090/4A090, added the advanced-computing Foreign Direct Product (FDP) rule, and extended Regional Stability (RS) controls to Country Groups D:1, D:4 and D:5. For items destined to Macau or Country Group D:5 the rule applies a PRESUMPTION OF DENIAL; other RS destinations get a presumption of approval. Practical effect: which accelerator you can legally be sold, and which SKU counts as compliant, is set by destination and end user - not by the channel.
LEAD TIME: null and it is an EXPLICIT NEGATIVE, checked 2026-10-04. This is a quote-only channel - no price and no lead time is published on any page, and AGENTS.md forbids inventing an unsourced number, so the field stays null with the reason recorded. The negative is itself a procurement fact: a channel that will not state a lead time is a channel where the lead time is set by whatever allocation you happen to have, and it is exactly the kind of number to ask for in writing before signing. Probe log and per-vendor detail in source spl-negative-no-oem-publishes-lead-time; the one figure published anywhere in this chain is AWS's 8-week MAXIMUM Capacity Block booking horizon, which is a commitment ceiling rather than a delivery time.
EXPORT CONTROL REGIME: SCHEME RECLASSIFIED (2026-10-04): was a bare boolean plus 'EXPORT CONTROLLED (true). Regime: the Oct 2023 interim final rule, 88 FR 73458' with no paragraph, no mechanism and no expiry. Now recorded as a citation plus the three-layer mechanism.