inference/research
verifiedhigh · 0.95updated 2026-10-04

Runpod Pods (dedicated H100 / H200 / A100 GPU instances)

nvidia · 30+ regions

Fields

id
supply/runpod-pods-h100-h200
Kind
cloud
Vendor
nvidia
Region
30+ regions
Channels
rentalon-demandserverlesscontact-sales
Price (USD)
3.49
Price basis
per GPU-hour, Community Cloud Pods (a dedicated instance, per-second billing available). H100 SXM $3.49; H100 PCIe $2.89; H100 NVL $3.19; H200 $4.59; B200 $6.79; B300 $7.89; A100 80GB $1.59; L40S $1.09; L40 $0.82; A40 $0.49; L4 $0.49; RTX 3090 $0.50; RTX 4090 $0.74; RTX Pro 6000 $2.09. Page states 'Updated September 27, 2026'; fetched 2026-10-03. PRICE CLASS: this is a PUBLISHED LIST PRICE - an asking rate a new customer is quoted, not a realised, discounted or negotiated transaction rate. A real bill is at or below this and typically well below it once commitments, credits and committed-use discounts are applied PERISHABLE-FIGURE STAMP (added 2026-10-04, uniform across data/supply/ so it is greppable). PRICE CLASS: PUBLISHED LIST PRICE - an asking rate a new customer is quoted, NOT a realised, discounted or negotiated transaction rate. A real bill is at or below this and typically well below it once commitments, credits and committed-use discounts apply. OBSERVED: 2026-10-03 RE-VERIFY BY: 2027-01-04 - the repo's quarterly re-verification bar. After that date this figure is presumed drifted and must be re-checked against its source before it is quoted again. A price without its observation date is noise; this stamp exists so a reader can tell a fresh figure from a stale one without reading prose. UNIT: per GPU-hour, Community Cloud Pods (a dedicated instance, per-second billing available) READING RULE: No further perishable flag is published for this figure.
Availability
in-stock
Lead time source
structural-na
Lead time basis
lead_time_weeks is null because the quantity is structurally not applicable: on-demand cloud capacity starts on request, so there is no order-to-delivery lead time. The constraint is the price per GPU-hour and the availability snapshot, not an interval. The one caveat worth keeping: scarce tiers gate capacity behind a reservation or Capacity Block commitment (AWS caps the booking horizon at 8 weeks, source spl-aws-capacity-block-booking-horizon), and that is a commitment window, not a lead time.
Export controlled
yes
Export control regime
EAR 742.6(a)(6)(iii)(A) + EAR 744.23/744.6 (Entity, Unverified, MEU list screening of the end user) + the advanced-computing IaaS obligations of 91 FR 1684 (consignee KYC, and management/limitation of IaaS access to the hardware)
Export control note
LAYER 1, EXPORT LICENCE: under the Jan 2026 BIS rule 91 FR 1684 (effective 2026-01-15) the license review policy for advanced-computing commodities with TPP < 21,000 AND total DRAM bandwidth < 6,500 GB/s - the NVIDIA H200 and AMD MI325X are the rule's named examples - moved from PRESUMPTION OF DENIAL to CASE-BY-CASE REVIEW, but only for exports FROM THE UNITED STATES to end users located in China or Macau, and only against six exporter certifications filed via SNAP-R before shipment: (1) items below the thresholds with the count of units shipped in the US; (2) sufficient US supply, judged 'taking into account normal lead times'; (3) no diversion of global foundry capacity away from US end users; (4) aggregate China+Macau shipments <= 50% of total US end-use shipments of that product; (5) no end-user or use prohibition; (6) the consignee runs rigorous KYC. Every shipment must then pass a qualified third-party testing lab - US-headquartered, not controlled by a D:5/Macau entity, no ownership stake in any party, qualification revocable by BIS at any time - verifying TPP, total DRAM bandwidth, interconnect bandwidth and copackaged DRAM capacity. Reexports and in-country transfers of the same chips to China/Macau REMAIN PRESUMPTION OF DENIAL. LAYER 2, END-USER AND PARENT SCREENING: per BIS guidance of 2026-05-31 a licence is required where the consignee is HEADQUARTERED in Country Group D:5 (15 CFR part 740 supplement no. 1) or Macau OR whose ULTIMATE PARENT COMPANY is so headquartered - even when the consignee itself sits outside D:5/Macau. The requirement sits at EAR 742.6(a)(6)(iii)(A) for destinations outside the US, with an exception available only under the license exception at 740.2(a)(9)(ii). The destination country alone therefore never answers the question; screen the parent. LAYER 3, REMAINING LIMITS: exports to D:5/Macau-headquartered OR -parented entities stay PRESUMPTION OF DENIAL wherever the buyer sits, and the AI Diffusion Rule that would have set a country-tier structure on who could lawfully buy what was RESCINDED on 2025-05-13 and is not being enforced, so any recorded status rests on the instruments named here rather than on tiering.
notes
THE BEST-PRICED H100 PER HOUR IN THE SLICE, $3.49 for SXM and $2.89 for PCIe, and the only provider here offering both the H100 SXM and the PCIe part at separately published prices so you can pick by form factor rather than by guesswork. Also the broadest catalogue: the same page lists B300, B200, RTX Pro 6000, H100 NVL, A40, A6000, 3090, 4090, 5090 and L40S, which makes it the one-stop shop if you need a consumer or workstation GPU for a small model. Three caveats that matter. (1) 'Community Cloud' is hosted hardware from third parties with a separate 'Secure Cloud' column at different rates - if your data matters, the number you want is the Secure Cloud one and the page does not price both in the extracted table. (2) Availability is genuinely in-stock, which is the whole reason Runpod is the fallback when AWS p5 is allocation-only. (3) The Clusters product is NOT the same price: H100 SXM and L40S and B200 clusters are 'Contact sales', and only H200 ($4.31) and A100 ($1.79) are published. Reserved Clusters are contact-sales for every GPU, with 1/3/6/12-month terms and no published discount. Storage runs $0.05-0.14/GB/month. No sales call and no contract for the Pod rate - a credit card is enough. EXPORT CONTROL (2026-10-04, mechanism-level; sources spl-bis-2026-05-d5-guidance, spl-bis-2026-01-advanced-computing-case-by-case): renting capacity does NOT remove the export-control question, it relocates it. Providing remote access to controlled computing capability can constitute a transfer under the EAR, so the provider must screen the end user; and separately, under the 91 FR 1684 licence regime the consignee must run KYC procedures to prevent unauthorized remote access and must manage and limit IaaS access to the hardware - obligations pushed onto the customer, who must be told to implement them. For a customer headquartered or parented in Country Group D:5 or Macau the 742.6(a)(6)(iii)(A) end-user/parent test can bite even when the capacity is consumed in a permitted region. Recorded true because the underlying hardware is controlled and the provider carries the screening duty, not because access to a US region is itself restricted. LEAD TIME: null, and correct as null. For a listed on-demand instance type the provisioning delay is effectively zero - capacity is allocated per request - so a week count would be meaningless; the real gate for scarce shapes is either a quota increase or a capacity reservation, not a lead time. Where a published commitment horizon exists it IS recorded: AWS documents that a Capacity Block may be reserved with a start time up to EIGHT WEEKS in the future (source spl-aws-capacity-block-booking-horizon), which is a floor on how far ahead scarce capacity must be committed, not a wait. On-demand and Spot tiers publish no lead time at all; their constraint is availability, and the repo records that as availability=in-stock or a spot/reality note rather than as a fabricated week figure. Probe log in source spl-negative-no-oem-publishes-lead-time.

Notes

THE BEST-PRICED H100 PER HOUR IN THE SLICE, $3.49 for SXM and $2.89 for PCIe, and the only provider here offering both the H100 SXM and the PCIe part at separately published prices so you can pick by form factor rather than by guesswork. Also the broadest catalogue: the same page lists B300, B200, RTX Pro 6000, H100 NVL, A40, A6000, 3090, 4090, 5090 and L40S, which makes it the one-stop shop if you need a consumer or workstation GPU for a small model. Three caveats that matter. (1) 'Community Cloud' is hosted hardware from third parties with a separate 'Secure Cloud' column at different rates - if your data matters, the number you want is the Secure Cloud one and the page does not price both in the extracted table. (2) Availability is genuinely in-stock, which is the whole reason Runpod is the fallback when AWS p5 is allocation-only. (3) The Clusters product is NOT the same price: H100 SXM and L40S and B200 clusters are 'Contact sales', and only H200 ($4.31) and A100 ($1.79) are published. Reserved Clusters are contact-sales for every GPU, with 1/3/6/12-month terms and no published discount. Storage runs $0.05-0.14/GB/month. No sales call and no contract for the Pod rate - a credit card is enough.

EXPORT CONTROL (2026-10-04, mechanism-level; sources spl-bis-2026-05-d5-guidance, spl-bis-2026-01-advanced-computing-case-by-case): renting capacity does NOT remove the export-control question, it relocates it. Providing remote access to controlled computing capability can constitute a transfer under the EAR, so the provider must screen the end user; and separately, under the 91 FR 1684 licence regime the consignee must run KYC procedures to prevent unauthorized remote access and must manage and limit IaaS access to the hardware - obligations pushed onto the customer, who must be told to implement them. For a customer headquartered or parented in Country Group D:5 or Macau the 742.6(a)(6)(iii)(A) end-user/parent test can bite even when the capacity is consumed in a permitted region. Recorded true because the underlying hardware is controlled and the provider carries the screening duty, not because access to a US region is itself restricted.

LEAD TIME: null, and correct as null. For a listed on-demand instance type the provisioning delay is effectively zero - capacity is allocated per request - so a week count would be meaningless; the real gate for scarce shapes is either a quota increase or a capacity reservation, not a lead time. Where a published commitment horizon exists it IS recorded: AWS documents that a Capacity Block may be reserved with a start time up to EIGHT WEEKS in the future (source spl-aws-capacity-block-booking-horizon), which is a floor on how far ahead scarce capacity must be committed, not a wait. On-demand and Spot tiers publish no lead time at all; their constraint is availability, and the repo records that as availability=in-stock or a spot/reality note rather than as a fabricated week figure. Probe log in source spl-negative-no-oem-publishes-lead-time.

Cross-references